Jump to content

Midway-class aircraft carrier

From Wikipedia, the free encyclopedia

USS Midway before SCB-110 upgrade
Class overview
NameMidway class
Builders
Operators United States Navy
Preceded byEssex class
Succeeded byForrestal class
SubclassesUSS Coral Sea
Built27 October 1943 – 2 April 1946
In commission10 September 1945 – 11 April 1992
Planned6
Completed3
Cancelled3
Retired3
Preserved1
General characteristics
TypeAircraft carrier
Displacement
Length
  • 968 ft (295 m) overall
  • 901 ft (275 m) waterline
  • 924 ft (282 m) flight deck
Beam
  • 121 ft (37 m) Waterline
  • 136 ft (41 m) Overall
Draft33 ft (10 m)
Installed power12 Babcock and Wilcox boilers
Propulsion
Speed33 knots (61 km/h; 38 mph)
Complement4,104
Sensors and
processing systems
  • As Built:
  • 1 × SC-2 Surveillance Radar
  • 2 × SG Surface Search Radars (On top Mark-37 GFCS)
  • 1 × SK-2 Air Search Radars
  • 2 × Mk-37 GFCS
Electronic warfare
& decoys
  • As Built:
  • 1 × TDY-2 ECM (Anti-Radar)
Armament
Armor
  • Portside Belt: 7.6 inch
  • Starboard Belt: 7 inch
  • Lower Edge and Upper Belt: 1.96 inch
  • Flight Deck: 3.5 inch
  • Hangar Deck: 2 inch
  • Main Deck: 2 inch
Aircraft carriedUp to 130 (1940s–50s), 65–70 (1980s)
Aviation facilities
  • Original Aviation Facilities:
  • 2 Centerline Aircraft Elevators
  • 1 Deck Edge Elevator
  • 2 Aircraft Catapults
  • 2 Hangar Decks
  • 1950s Modernizations:
  • 1 Centerline Aircraft Elevator
  • 2 Deck Edge Elevators
  • 3 Steam Catapults
  • Angled Flight Deck
  • 1970s Modernizations for USS Midway:
  • 3 Deck Edge Aircraft Elevators
  • 2 Steam Catapults
  • Enlarged Angled Flight Deck
Franklin D. Roosevelt under way in 1969

The Midway class was a class of three United States Navy aircraft carriers. The lead ship, USS Midway, was commissioned in September 1945 and decommissioned in 1992. USS Franklin D. Roosevelt was commissioned in October 1945, and taken out of service in 1977.[2] USS Coral Sea was commissioned in April 1947, and decommissioned in 1990.[3]

History

[edit]

1940s

[edit]

The CVB-41-class vessels (then unnamed) were originally conceived in 1940 as a design study to determine the effect of including an armored flight deck on a carrier the size of the Essex class. The resulting calculations showed that the effect would be a reduction of air group size—the resulting ship would have an air group of 64,[4] compared to 90–100[5][6] for the standard Essex-class fleet carriers. As it progressed, the design also became heavily influenced by the wartime experience of the Royal Navy's armored carriers:

As a result of study of damage sustained by various British carriers prior to our entry into the war, two important departures from traditional U.S. Navy carrier design were incorporated in the CVB Class, then still under development. HMS Illustrious in an action off Malta on 1 January 1941 was hit by several bombs, three of which detonated in the hangar space. Large fires swept fore and aft among parked planes thereby demonstrating the desirability of attempting to confine the limits of such explosions and fires by structural sectionalization of the hangar space. On the CVB Class the hangar was therefore divided into five compartments separated by 40 and 50-pound Special Treatment Steel (STS)[7] division bulkheads extending from the hangar deck to the flight deck, each fitted with a large door suitable for handling aircraft. It is hoped that this sectionalization, in conjunction with sprinkler and fog foam systems, will effectively prevent fires from spreading throughout the hangar spaces, as occurred on USS Franklin on 30 October and 19 March. The damage experiences of several British carriers, which unlike our own were fitted with armored flight decks, demonstrated the effectiveness of such armor in shielding hangar spaces from GP bombs and vital spaces below the hangar deck from semi-armor-piercing (SAP) bombs. Accordingly, the CVB Class was designed with an armored flight deck consisting of 3-1/2-inch STS from frames 46 to 175 with a hangar deck consisting of two courses of 40-pound STS between frames 36 and 192. Although none of the CVB Class carriers were completed in time to take part in war operations, the effectiveness of armored flight decks against Kamikaze attacks was demonstrated by various carriers attached to the British Pacific Fleet ...

— [8]

The concept went to finding a larger carrier that could support both deck armor and a sufficiently large air group. The weight-savings needed to armor the flight deck were achieved by removing the planned cruiser-caliber battery of 8-inch (203 mm) guns and reducing the 5-inch antiaircraft battery from dual to single mounts. Unlike the Royal Navy's aircraft carriers, for which the armored deck was part of the ship structure, the Midway class retained their "strength deck" at the hangar deck level and the armored flight deck was part of the superstructure. They would be the last USN carriers to be so designed; the immense size of the succeeding Forrestal-class supercarriers would require a new deep-hulled design carrying the strength deck at the flight deck level to produce a stronger and lighter hull.

The heavily subdivided arrangement of the machinery spaces was based on that of the Montana-class battleship, while the two inner propeller shafts were partially enclosed in skegs, similar to contemporary battleship construction.[9] While the Essex-class carriers had eight main engineering compartments, the Midway-class had 26, including twelve boiler rooms well off the centerline and four widely separated engine rooms. More extensive use of electric arc-welding than in previous warships reduced the weight by about 10 percent of what would have been required for riveted structural assembly.[10]

The resulting Midway-class carriers were very large, with the ability to accommodate more planes than any other carrier in the U.S. fleet (30–40 more aircraft than the Essex class). In their original configuration, the Midway-class ships had an airwing of up to 130 aircraft. It was soon realized that the coordination of so many planes was beyond the effective command and control ability of one ship.[why?] However, their size did allow these ships to more easily accommodate the rapid growth in aircraft size and weight that took place in the early jet age. The forward flight deck was designed for launching 13-ton aircraft; and the aft flight deck was designed for landing 11-ton aircraft, assuming in-flight expenditure of fuel and ordnance.[10]

While the resulting ships featured excellent protection and unprecedented airwing size, they also had several undesirable characteristics. Internally, the ships were very cramped and crowded. Freeboard was unusually low for such large carriers; in heavy seas, they shipped large amounts of water[10] (only partially mitigated by the fitting of a hurricane bow during the SCB-110/110A upgrades) and corkscrewed in a manner that hampered landing operations. The follow-up Forrestal-class featured a deeper hull that had more freeboard and better seakeeping.

In contrast with the earlier Lexington, Yorktown and Essex-classes, the beam (width) of the Midway-class carriers meant that they could not pass through the Panama Canal.

Although they were intended to augment the US Pacific fleet during World War II, the lead ship of the class, Midway, was not commissioned until 10 September 1945, eight days after the surrender of Japan.[10]

While Midway and Coral Sea followed the US Navy's policy of naming aircraft carriers after battles (two Casablanca-class escort carriers gave up their names for the larger ships), USS Franklin D. Roosevelt inaugurated the policy of naming aircraft carriers after former US Presidents that the US Navy generally follows today.

1950s

[edit]

None of the class went on war cruises during the Korean War. As the three ships became essential to the Navy's strategic nuclear weapons role in Europe, they were mainly deployed to the Atlantic and Mediterranean. Until the availability of the Forrestal class, they were the premier commands sought by senior naval aviators. They were "admiral makers" for many of their commanding officers including future Chief of Naval Operations George Whelan Anderson Jr. and David L. McDonald.

During the 1950s, Midway and Franklin D. Roosevelt underwent the SCB-110 modernization program (similar to SCB-125 for the Essex class), which added angled flight decks, steam catapults, mirror landing systems, and other modifications that allowed them to operate a new breed of large, heavy naval jets. Coral Sea had a variant modernization program called SCB-110A with an angled deck 3 degrees greater than the other two.[10][11]

1960s

[edit]

All three of the Midway class made combat deployments in the Vietnam War. Coral Sea deployed to the Gulf of Tonkin six times, Midway deployed on three occasions, and Franklin D. Roosevelt made one combat deployment before returning to the Mediterranean.

In the late 1960s, Midway underwent an extensive modernization and reconstruction program under SCB 101.66, which proved to be controversial and expensive and thus was not repeated on the other ships. While $82 million had been budgeted for the modernization, the actual cost was $202 million, in comparison to $277 million for simultaneous construction of the brand-new USS John F. Kennedy.[10]

1970s

[edit]

By the 1970s, Franklin D. Roosevelt and Coral Sea were showing their age. All three retained the McDonnell Douglas F-4 Phantom II in their air wings, being too small to operate the new Grumman F-14 Tomcat fleet defense fighter or the S-3 Viking anti-submarine jet. In 1977, Franklin D. Roosevelt was decommissioned. On her final deployment, Roosevelt embarked AV-8 Harrier jump jets to test the concept of including VSTOL aircraft in a carrier air wing.

Midway (above/left) and Coral Sea (above/right) in the 1980s; the difference in their appearance at this late stage in their service is due to Midway's extensive rebuild in the late 1960s, which was not carried out on Coral Sea.

1980s

[edit]

Coral Sea was rescued from imminent decommissioning by the election of Ronald Reagan as president of the United States in 1980. Reagan's proposed 600-ship Navy gave the remaining ships a new lease on life. Coral Sea underwent extensive refits to address the ship's poor condition. When the McDonnell Douglas F/A-18 Hornet became operational in the mid-1980s, the Navy quickly deployed them to the Midway and Coral Sea to replace the older F-4s. A 1986 refit for Midway removed her 6" armor belt and bulged her hull to try to increase freeboard. While successful in this regard, the bulges also resulted in a dangerously fast rolling period that prevented Midway from operating aircraft in heavy seas. The bulging was therefore not repeated on Coral Sea.

1990s

[edit]

The Reagan era reprieve could not last. In 1990, Coral Sea, which had long since earned the nickname "Ageless Warrior", was decommissioned. Midway had one last war in which to participate, and was one of the six aircraft carriers deployed by the U.S. against Iraq during Operation Desert Storm.[12] A few months after the campaign, the last of the class left Navy service.

Coral Sea was slowly scrapped at Baltimore as legal and environmental troubles continually delayed her fate. Midway spent five years in the mothball fleet at Bremerton, Washington before being taken over by a museum group. The ship is now open to the public at the USS Midway Museum in San Diego, California.

Ships in class

[edit]
Name Hull no. Builder Laid down Launched Commissioned Decommissioned Fate
Midway CV-41
CVB-41
CVA-41
Newport News Shipbuilding and Dockyard Co., Newport News 27 October 1943 20 March 1945 10 September 1945 11 April 1992 Museum ship at San Diego
Franklin D. Roosevelt (ex-Coral Sea) CV-42
CVB-42
CVA-42
New York Naval Shipyard, New York City 1 December 1943 29 April 1945 27 October 1945 30 September 1977 Broken up at Kearny, 1978
Coral Sea CV-43
CVB-43
CVA-43
Newport News Shipbuilding and Dockyard Co., Newport News 10 July 1944 2 April 1946 1 October 1947 26 April 1990 Broken up at Baltimore, 2000
unnamed CV-44 Cancelled 11 January 1943
unnamed CVB-56 Cancelled 28 March 1945
unnamed CVB-57

Hull codes;

  • CV – Fleet/Multi-purpose carrier
  • CVA – Attack carrier
  • CVB – Large carrier

See also

[edit]

References

[edit]
  1. ^ Dorais, Bob. "UNDERWAY Ships Specifications". www.usscoralsea.net. Retrieved 15 April 2022.
  2. ^ Go Navy, USS Franklin D. Roosevelt
  3. ^ USS Coral Sea USS CORAL SEA TRIBUTE SITE
  4. ^ Friedman, U.S. Aircraft Carriers, p. 213: "Table 9-1. Evolution of Schemes for the Midway Design 1940–41". Design CV-D displaced 28,000 tons and had a nominal complement of 64 aircraft.
  5. ^ Roberts, John, The Aircraft Carrier Intrepid, p. 8. London: Conway Maritime Press, 1982.
  6. ^ Friedman, U.S. Aircraft Carriers, p. 138: Friedman discusses how the proposed Essex-class carriers were designed for a nominal complement of 74 aircraft in 4 squadrons of aircraft, but these numbers were constantly revised due to changes in aircraft weight and dimensions, and the perceived increased need for fighters which had smaller dimensions than strike aircraft.
  7. ^ STS = Special Treatment Steel. STS was a form of high tensile steel that was often used to provide armor protection. 40 and 50-pound refers to armor that was 1-inch (25 mm) or 1.25 inches (32 mm) thick (40 or 50-pound weight per square ft).
  8. ^ Bureau of Ships, Navy Dept CV13 Damage Report
  9. ^ Friedman, Norman (1983). U.S. Aircraft Carriers: An Illustrated Design History. Annapolis, Maryland: Naval Institute Press. p. 219. ISBN 0-87021-739-9.
  10. ^ a b c d e f Grassey, Thomas B. (1986). "Retrospective: The Midway Class". Proceedings. 112 (5). United States Naval Institute: 182–199.
  11. ^ Friedman, U.S. Aircraft Carriers, p. 300
  12. ^ AR 600-8-27 p. 26 paragraph 9–14, p. 28 paragraph 2–14
[edit]